User Tools

Site Tools


engtasks

Engineering Tasks (assigned to Omer :) )

task status additional information
brazent for aquarium Done 2*0.6*1.08 long*width*height
laser curtains in progress 3+2.4+0.2 * 2m height
filter-pump for the aquarium in progress filters which will fit for 10-250 micron
cabel for the lift in progress problems:rusttiness and and the cabel is coiling
configuring linear stages in progress stages:1.reading how to config with their software 2.connect to terminal and config
engtasks.txt · Last modified: by ohad

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki